Abdelbaky Ahmed

Resident Engineer at Dr. M.H. Ali El Saie Consulting Engineers

Cairo,Cairo Governorate,Egypt | Engineering / Infrastructure / Construction / EPC

Connect
Profile




Name: Abdel Baky Ahmed Abdel Hafiez
Nationality: Egyptian
Born: 28/08/1981 – Cairo, Egypt.
Language Capability: Arabic – English
Passport Details: No. A08248892 - Cairo, Egypt.
E-mail Address: abdelbaky5000@yahoo.com
Mobile: ( 002 0100 225 1027 ) - Cairo - Egypt
Driving License: ( EGYPT / U.A.E Driving licenses valid till 2018 )
Qualification: • B.Sc. Civil Engineering, Faculty of Engineering (Cairo University, Cairo – Egypt).
• PMP Course Certified From Cambridge Institute - 2011 Abu Dhabi - U.A.E.
• Member Of "The Engineering Syndicate (No. 02741/ 26), Cairo – Egypt.
Date Of Graduation: 2003
Total Years Of Experience: 14 Years
Position: Assistant Resident Engineer
Field Of Experience: Design and Supervision of various international infrastructure projects (Pressurized pipelines, Networks, Transmissions pipelines, etc.). The relevant experience covers several infrastructure disciplines including Potable Water, Irrigation, Fire fighting networks, Sewage, Storm Water, Electric, Telecom…etc.
FROM NOV. 2014 TILL MAR 2016 Dr. M.H. Ali El Saie Consulting Engineers, Abu Dhabi, UAE
FROM OCT. 2012 TILL NOV. 2014 Dr. M.H. Ali El Saie Consulting Engineers, Abu Dhabi, UAE
FROM JULY 2004 TILL OCT. 2012 Dr. M.H. Ali El Saie Consulting Engineers, Abu Dhabi, UAE
FROM SEPT. 2003 TILL JULY 2004 United Consultant For Planning & Urban Design, Cairo, Egypt

EXPERIENCE RECORD
FROM NOVEMBER, 2014 TILL MAR 2016
Employer : DR. M.H. ALI EL SAIE CONSULTING ENGINEERS
Client : Abu Dhabi Distribution Company (ADDC)
Projects : Consultancy Services for Construction of pressurized pipelines at different locations in Madinat Zayed, Ghayathi and Delma Island – Western Region.
Contract No. D-102469 - Budget 45,000,000 DHs
Consultancy Services for Construction / Renovation of Washouts in Liwa East & West – Water Supply to Camel Race at Madinat Zayed – Western Region
Contract No. D-102331 - Budget 35,000,000 DHs
Position : Assistant Resident Engineer
Duties & Responsibilities:
Assistant Resident Engineer for Pressurized pipelines at different locations in Madinat Zayed, Ghayathi and Delma Island at Western Region (DN 300 mm DI pipes with total length of 32 km along with its associated valve chambers) as well as Construction / Renovation of 25 Nos. of Washouts vlave chambers in Liwa East & West / Water Supply to Camel Race at Madinat Zayed at Western Region (DN 250 & 300 mm DI pipes with total length of 35 km along with its associated valve chambers & fire hydrants) in addition to construction of several infrastructure disciplines including Potable Water, Irrigation, Fire fighting networks, Storm Water,..etc. . I assigned and responsible for the following duties:-
1- Reviewing the Following Contractor’s Submittals:
a) Shop Drawings: (Plans, Profiles, Valve chambers, Thrust blocks, House connections, Road crossings, Service reservations…etc).
b) Material Submittals: (HDPE Pipes/Fittings, D.I./GRP Pipes/Fittings, Gate Valves/NRV/ Dismantling Joints/Strainers/Meters, Cast Iron Covers, Aluminum Ladders, Sealing Flanges, Fire Hydrants…etc).
c) Reports: (Receiving Cum Damage Report, Monthly Progress Report, Design Report, Calculations, QC, Safety, Resources…etc).
d) Method Statements: (Pipe’s Storage/Handling/installation/ Hydrostatic Testing, HDPE Welding Procedure, Non Disruptive Road Crossings, Bulk Consumer Connections, Tie-in Connections, Shutdown Procedures, Concrete Pouring Arrangements, Flushing, Disinfection…etc).
e) Time Schedules: (Project over all Time Schedule against Actual Progress, Material Delivery Schedule, Document Control Table…etc).
f) Payment Certificates: (Monthly Payment Certificates & Projected Cash Flow against Actual Interim Payments).
2- Witnessing of Material’s Factory & Site Tests:
a) Factory Tests: (HDPE Pipes Melting Flow Rate Test/Tensile Stress/Hydrostatic Pressure Test, Bearing Load Test for Chamber Covers, Epoxy Coating/Painting Thickness Using Ultrasonic Measuring Device, Physical Properties of Various Materials…etc).


b) Site Tests: (Compaction Test, Holiday Test, Bead Thickness and Bending Tests for HDPE Pipes, Coating/Painting/Lining Thickness, Site Water Hydrostatic Pressure Test for both D.I. and HDPE Pipes, Various Visual Inspections, …etc.).
3- Supervising the following Site Activities:
a) Excavation.
b) Pipe Bedding.
c) Compaction Tests.
d) Pipes/Fittings/Valves Installation.
e) Welding of HDPE Pipes.
f) Hydrostatic Pressure Test.
g) Non Disruptive Road/Gas crossing using Horizontal Direction Drilling Technique.
h) Formwork, Rebar and Pouring of Valve chambers, Thrust Blocks and Protection Slabs...etc.
i) Backfilling.
j) Flushing, Disinfection, Shutdowns, Tie-in Connections…etc.
4- Follow-up Meetings & Preparation of Agenda/Minutes of Client/Engineer/Contractor Meetings
5- General oversight of contractor’s operations and monitoring the performance.
6- Preparation of Regular Progress Reports (daily, weekly, monthly, financial, variation orders...etc.
7- Following-up of the project’ handing over process with all concerned parties till issuance of the project close out report (As-Built, Material re-conciliation, O&M manuals, training, final payment.. etc ) until issuance of PAC.
FROM OCTOBER, 2012 TILL NOVEMBER ,2014

Employer : DR. M.H. ALI EL SAIE CONSULTING ENGINEERS
Client : Abu Dhabi Distribution Company (ADDC)
Projects : Consultancy Services for Replacement of Existing pressurized pipelines/Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02
(Tender No. D-103289) - Budget 90,000,000 DHs
Consultancy Services for the Replacement of the pressurized pipelines/Existing Water Distribution Network in Mussafah Industrial Area of Eastern Region for Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20
(Tender No. D-103290) - Budget 130,000,000 DHs
Position : Senior Pipeline Design Engineer.
Duties & Responsibilities:
Hydraulic Design Engineer for pressurized pipelines. The project objective is to improve the existing water supply system in Sectors E9-02, E10, E13 and W14-02 in Abu Dhabi Island & Mussafah Industrial Area of Eastern Region for Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20 by replacing the existing network with new upgraded network.

The project scope of work inclusive all the required works for the replacement of approximately 39 KM (Abu Dhabi Island) & 86 KM (Mussafah Industrial Area) of the existing water distribution network with all associated civil works for the aforementioned Sectors. In addition to design & construction of several infrastructure disciplines including Potable Water, Irrigation, Fire fighting networks, Storm Water,..etc.

I was assigned / responsible for the following duties:-
1- Participating in preparation of preliminary Design Report.
2- Preparation of Master plan & profiles.
3- Design of detailed pipeline profiles drawings.
4- Preparation of detailed design of valve chambers and Service / Connections details for all different types of pipeline materials.
5- Pipeline Materials studies (D.I & HDPE /GRP)
6- Hydraulic Modeling / Analysis & assessment of proposed water network.
7- Verification of new pipeline sizes.
8- Preparation of Cost Estimate of the project with two options (D.I & HDPE /GRP)
9- Liaison & Coordination with the relevant concerned authorities to obtain all the necessary information / Data (ADDC, UPC, ADM, ADSSC …etc.)
10- Liaison & Coordination with ADDC to obtain Current Consumption and expected future Water demand plan.
11- Liaison & Coordination with UPC to obtain land use details map & expected future development plan 2030.
12- Preparation of Regular Monthly Progress Reports.
13- Update the projects time schedule in monthly basis within the project specified duration.
14- Management, Coordination and follow up progress of the project activities with the concerned Staff / Team.

Employer : DR. M.H. ALI EL SAIE CONSULTING ENGINEERS
End User : TRANSCO
Owner : ABU DHABI MUNCIBILITY
Client : Dong Myeong Engineering & Consultancy (DMEC)
Project : Design & Engineering services for re-routing of pressurized pipelines for existing TRANSCO twin Water Transmission pipelines DN 900 mm C.S at SHAWAMEK (SHM-6) - Budget 18,000,000 DHs
Position : Project Manager.

Duties & Responsibilities:
Project Manager for re-routing of Pressurized pipelines comprising existing TRANSCO twin water transmission pipelines DN 900 mm C.S conflicting with the newly proposed SHM-6 plot layout as well as construction of several infrastructure disciplines including Irrigation, Fire fighting networks, Storm Water,..etc and I was assigned / responsible for the following duties:-

A- Engineering phase as follows :-
1- Preparation of preliminary Design Report.
2- Preparation of Master plan & profiles.
3- Design of detailed profiles drawings.
4- Preparation of detailed design of valve chambers and Connection details for all different types of pipeline materials.
5- Tendering & Evaluation.
B- Construction phase as follows :-
1- Reviewing the Following Contractor’s Submittals:
a) Shop Drawings: (Plans, Profiles, Valve chambers, Thrust /Line anchor blocks, Road crossings, Service reservations…etc).
b) Material Submittals: (D.I. /GRP Pipes/Fittings, Gate Valves/Dismantling Joints, Cast Iron Covers, Aluminum Ladders, Sealing Flanges, …etc).
c) Reports: (Receiving Cum Damage Report, Monthly Progress Report, Design Report, Calculations, QC, Safety, Resources…etc).
d) Method Statements: (Pipe’s Storage/Handling/installation/ Hydrostatic Testing, Non Disruptive Road Crossings, Tie-in Connections, Shutdown Procedures, Concrete Pouring Arrangements, Flushing, Disinfection…etc).
e) Time Schedules: (Project over all Time Schedule against Actual Progress, Material Delivery Schedule, Document Control Table…etc).
f) Payment Certificates: (Monthly Payment Certificates & Projected Cash Flow against Actual Interim Payments).
2- Witnessing of Material’s Factory & Site Tests:
a) Factory Tests: (Hydrostatic Pressure Test, Bearing Load Test for Chamber Covers, Epoxy Coating/Painting Thickness Using Ultrasonic Measuring Device, Physical Properties of Various Materials…etc).
b) Site Tests: (Compaction Test, Holiday Test, Bead Thickness, Coating/Painting/Lining Thickness, Site Water Hydrostatic Pressure Test for D.I. Pipes, Various Visual Inspections …etc.).
3- Supervising the following Site Activities:
a) Excavation.
b) Pipe Bedding.
c) Compaction Tests.
d) Pipes/Fittings/Valves Installation.
e) Hydrostatic Pressure Test.
f) Formwork, Rebar and Pouring of Valve chambers, Thrust Blocks and Protection Slabs...etc.
g) Backfilling.
h) Flushing, Disinfection, Shutdowns, Tie-in Connections…etc.


4- Follow-up Meetings & Preparation of Agenda/Minutes of Client/Engineer/Contractor Meetings
5- General oversight of contractor’s operations and monitoring the performance.
6- Preparation of Regular Progress Reports (daily, weekly, monthly, financial, variation orders...etc.
7- Following-up of the project’ handing over process with all concerned parties till issuance of the project close out report (As-Built, Material re-conciliation, O&M manuals, training, final payment.. etc ) until issuance of PAC.

Employer : DR. M.H. ALI EL SAIE CONSULTING ENGINEERS
End User : ADDC
Owner : ETIHAD RAIL
Client : TRANS DESERT CONT. & GEN. MAINT. EST.
Project : EPC – Pressurized pipelines crossing for Shah – Habshan – Ruwais Etihad Railway (Stage -1) - Budget 22,000,000 DHs
Position : Project Manager (Infrastructure).
Duties & Responsibilities:

Project Manager for rerouting of all Pressurized pipelines comprising existing ADDC water pipes crossing with the stage-1 railway at different locations in western region as well as construction of several infrastructure disciplines including Potable Water, Irrigation, Fire fighting networks, Storm Water,..etc and I was assigned / responsible for the following duties :-
1- Reviewing the Following Contractor’s Submittals:
a) Shop Drawings: (Plans, Profiles, Valve chambers, Thrust blocks, Road crossings, Service reservations…etc).
b) Material Submittals: (D.I. /GRP Pipes/Fittings, Gate Valves/Dismantling Joints, Cast Iron Covers, Aluminum Ladders, Sealing Flanges, …etc).
c) Reports: (Receiving Cum Damage Report, Monthly Progress Report, Design Report, Calculations, QC, Safety, Resources…etc).
d) Method Statements: (Pipe’s Storage/Handling/installation/ Hydrostatic Testing, Non Disruptive Road Crossings, Tie-in Connections, Shutdown Procedures, Concrete Pouring Arrangements, Flushing, Disinfection…etc).
e) Time Schedules: (Project over all Time Schedule against Actual Progress, Material Delivery Schedule, Document Control Table…etc).
f) Payment Certificates: (Monthly Payment Certificates & Projected Cash Flow against Actual Interim Payments).
2- Witnessing of Material’s Factory & Site Tests:
a) Factory Tests: (Hydrostatic Pressure Test, Bearing Load Test for Chamber Covers, Epoxy Coating/Painting Thickness Using Ultrasonic Measuring Device, Physical Properties of Various Materials…etc).
b) Site Tests: (Compaction Test, Holiday Test, Bead Thickness, Coating/Painting/Lining Thickness, Site Water Hydrostatic Pressure Test for D.I. Pipes, Various Visual Inspections …etc.).

3- Supervising the following Site Activities:
a) Excavation.
b) Pipe Bedding.
c) Compaction Tests.
d) Pipes/Fittings/Valves Installation.
e) Hydrostatic Pressure Test.
f) Non Disruptive Road/Gas crossing using Horizontal Direction Drilling Technique.
g) Formwork, Rebar and Pouring of Valve chambers, Thrust Blocks and Protection Slabs...etc.
h) Backfilling.
i) Flushing, Disinfection, Shutdowns, Tie-in Connections…etc.
4- Follow-up Meetings & Preparation of Agenda/Minutes of Client/Engineer/Contractor Meetings
5- General oversight of contractor’s operations and monitoring the performance.
6- Preparation of Regular Progress Reports (daily, weekly, monthly, financial, variation orders...etc.
7- Following-up of the project’ handing over process with all concerned parties till issuance of the project close out report (As-Built, Material re-conciliation, O&M manuals, training, final payment.. etc ) until issuance of PAC.

Employer : DR. M.H. ALI EL SAIE CONSULTING ENGINEERS
End User : Federal Electricity & Water Authority (FEWA)
Clients : DARWISH ENGINEERING EMIRATES (Contract: 24W/2012)
ARCO GENERAL CONTRACTING (Contract: 4EW/2011)
Projects : 24W/2012 - Transmission Pipeline within City & Industrial Area -Ajman
4EW/2011 – Construction of New Well Fields at SURRAH, U.A.Q - Budget 170,000,000 DHs
Position : Senior Hydraulic Design Engineer.
Duties & Responsibilities:

Project Design Engineer (Hydraulics) of all Pressurized pipelines for project (Transmission Pipeline within City & Industrial Area –Ajman) – D.I pipeline DN 600 MM – 21 km

I was assigned / responsible for the following duties:-
1- Participating in preparation of preliminary Design Report (4EW/2011)
2- Preparation of Master plan & profiles (24W/2012)
3- Design of detailed pipeline profiles drawings (24W/2012)
4- Preparation of detailed design of valve chambers and Connection details for all different types of pipeline materials (24W/2012)
5- Shop drawings & Submittals review (4EW/2011)

FROM MAY, 2008 TILL OCTOBER 2012
Employer : DR. M.H. ALI EL SAIE CONSULTING ENGINEERS
Client : MANAZEL REAL ESTATE (MRE)
Project : Al Reef Villas Infrastructure, Budget 450,000,000 DHs
Position : Assistant Resident Engineer.
Duties & Responsibilities:
Assistant Resident Engineer in the Supervision Team for Al Reef Villas project ( 20 km of Pressurized pipelines for H.D.P.E / GRP pipeline network DN 110, 180, 250 & 500 mm) & 7 km of D.I pipeline DN 400 mm) as well as construction of valve chambers, Bulk consumers & House Connections, Fire Hydrants, ADDC /TRANSCO interface Connections…etc.) as well as construction of several infrastructure disciplines including Potable Water, Irrigation, Fire fighting networks, Sewage, Storm Water, Electric, Telecom. I was assigned / responsible for the following duties :-
1- Reviewing the Following Contractor’s Submittals:
a) Shop Drawings: (Plans, Profiles, Valve chambers, Thrust blocks, House connections, Road crossings, Service reservations…etc).
b) Material Submittals: (HDPE Pipes/Fittings, D.I. Pipes / GRP Pipes/Fittings, Gate Valves/NRV/ Dismantling Joints/Strainers/Meters, Cast Iron Covers, Aluminum Ladders, Sealing Flanges, Fire Hydrants…etc).
c) Reports: (Receiving Cum Damage Report, Monthly Progress Report, Design Report, Calculations, QC, Safety, Resources…etc).
d) Method Statements: (Pipe’s Storage/Handling/installation/ Hydrostatic Testing, HDPE Welding Procedure, Non Disruptive Road Crossings, Bulk Consumer Connections, Tie-in Connections, Shutdown Procedures, Concrete Pouring Arrangements, Flushing, Disinfection…etc).
e) Time Schedules: (Project over all Time Schedule against Actual Progress, Material Delivery Schedule, Document Control Table…etc).
f) Payment Certificates: (Monthly Payment Certificates & Projected Cash Flow against Actual Interim Payments).
2- Witnessing of Material’s Factory & Site Tests:
a) Factory Tests: (GRP / HDPE Pipes Melting Flow Rate Test/Tensile Stress/Hydrostatic Pressure Test, Bearing Load Test for Chamber Covers, Epoxy Coating/Painting Thickness Using Ultrasonic Measuring Device, Physical Properties of Various Materials…etc).
b) Site Tests: (Compaction Test, Holiday Test, Bead Thickness and Bending Tests for HDPE Pipes, Coating/Painting/Lining Thickness, Site Water Hydrostatic Pressure Test for both D.I., HDPE & GRP Pipes, Various Visual Inspections, …etc.).
3- Supervising the following Site Activities:
a) Excavation.
b) Pipe Bedding.
c) Compaction Tests.
d) Pipes/Fittings/Valves Installation.

e) Welding of HDPE Pipes.
f) Hydrostatic Pressure Test.
g) Non Disruptive Road/Gas crossing using Horizontal Direction Drilling Technique.
h) Formwork, Rebar and Pouring of Valve chambers, Thrust Blocks and Protection Slabs...etc.
i) Backfilling.
j) Flushing, Disinfection, Shutdowns, Tie-in Connections…etc.
4- Follow-up Meetings & Preparation of Agenda/Minutes of Client/Engineer/Contractor Meetings
5- General oversight of contractor’s operations and monitoring the performance.
6- Preparation of Regular Progress Reports (daily, weekly, monthly, financial, variation orders...etc.
7- Following-up of the project’ handing over process with all concerned parties till issuance of the project close out report (As-Built, Material re-conciliation, O&M manuals, training, final payment.. etc ) until issuance of PAC.
From July 2005 to May 2008
Employer : DR. M.H. ALI EL SAIE CONSULTING ENGINEERS:
Client : Abu Dhabi Water & Electricity Authority (ADWEA) / Abu Dhabi Distribution Company (ADDC)
Project : Ghayathi Project (Western Region) – Budget - 47,000,000 DHs
Project main components were as follows:-
- 35 km of DN 600 mm D.I pipeline
- 3.5 km of DN 800 mm D.I pipeline
- 21 km of DN 160 mm H.D.P.E pipeline
- 3 km of DN 300 mm D.I pipeline.
- 2.5 km of DN 355 mm H.D.P.E pipeline
- Extension of existing pumps station at Bida Al Mutawa.
Position : Senior Civil Engineer
Duties & Responsibilities:
1- Supervising the following Site Activities:
 Excavation.
 Pipe Bedding.
 Compaction Tests.
 Pipes/Fittings/Valves Installation.
 Welding of HDPE Pipes.
 Hydrostatic Pressure Test.
 Non Disruptive Road/Gas crossing using Horizontal Direction Drilling Technique.

 Formwork, Rebar and Pouring of Valve chambers, Thrust Blocks and Protection Slabs...etc.
 Backfilling.
 Flushing, Disinfection, Shutdowns, Tie-in Connections…etc.
2- Witnessing of Material’s Factory & Site Tests:
 Factory Tests: (HDPE Pipes Melting Flow Rate Test/Tensile Stress/Hydrostatic Pressure Test, Bearing Load Test for Chamber Covers, Epoxy Coating/Painting Thickness Using Ultrasonic Measuring Device, Physical Properties of Various Materials…etc).
 Site Tests: (Compaction Test, Holiday Test, Bead Thickness and Bending Tests for HDPE Pipes, Coating/Painting/Lining Thickness, Site Hydrostatic Pressure Test for both D.I. and HDPE Pipes, Various Visual Inspections, …etc.)
From July 2004 to July 2005
Employer : DR. M.H. ALI EL SAIE CONSULTING ENGINEERS
Client : ABU DHABI DISTRIBUTION COMPANY (ADDC)
Project : Mussafah Project (Central Region) – Budget - 40,000,000 DHs
Position : Site Civil Engineer
Duties:
1- Supervising the following Site Activities:
 Excavation.
 Pipe Bedding.
 Compaction Tests.
 Pipes/Fittings/Valves Installation.
 Welding of HDPE Pipes.
 Hydrostatic Pressure Test.
 Non Disruptive Road/Gas crossing using Horizontal Direction Drilling Technique.
 Formwork, Rebar and Pouring of Valve chambers, Thrust Blocks and Protection Slabs...etc.
 Backfilling.
 Flushing, Disinfection, Shutdowns, Tie-in Connections…etc.
2- Witnessing of Material’s Factory & Site Tests:
 Factory Tests: (HDPE Pipes Melting Flow Rate Test/Tensile Stress/Hydrostatic Pressure Test, Bearing Load Test for Chamber Covers, Epoxy Coating/Painting Thickness Using Ultrasonic Measuring Device, Physical Properties of Various Materials…etc).
 Site Tests: (Compaction Test, Holiday Test, Bead Thickness and Bending Tests for HDPE Pipes, Coating/Painting/Lining Thickness, Site Hydrostatic Pressure Test for both D.I. and HDPE Pipes, Various Visual Inspections, …etc.).





From Sept 2003 To July 2004
Employer: United Consultant for Planning & Urban Design Office Cairo, Egypt
Duties & Responsibilities:
- Site Engineer, Cairo, Egypt.
- Supervision Of Multi Story Building ( High Rise Building )
- Foundation Concrete Works.
- Columns & Slabs Concrete Works.
- Plastering, Tile Works & Plumbing Works etc.
Other Projects (Abu Dhabi, U.A.E)
1- Participating in preparation of Design Report, Master plan, Detailed Drawings and Tender Documents for the following projects:
- Water supply to Sheikh Ahmed Bin Zayed Al Nahyan Island, Abu Dhabi, UAE, ADDC’s Tender No. D8460. (Contract Specifications, Conditions, BOQ, Drawings…etc.).
- Water supply to Downtown, Abu Dhabi, UAE, Manazel Real Estate (Contract Specifications, Conditions, BOQ, Drawings…etc.).
2- Preparation of the Technical & Commercial Evaluation of the projects under bidding.
3- Assistant Resident Engineer (A.R.E Civil - Water works) In the Supervision Team for Relocation of 2 Nos. dia. 900mm C.S and 1 No. Dia 1000 mm D.I pipes (Transco water main lines).
Project : Cadastral Modon and Production The Maps For El-Mokatam Project with area 36 km2 .
Client : Surveying and Mapping, (ESA) Egyptian Survey Authority, (1) Abdel-Salam Aref, Orman, Giza, Egypt.
Position : Technical Office Engineer & Site Engineer
Duties & Responsibilities:
- Prepare Digital Maps by using AutoCAD program
o The traverse control points for large areas.
o Traverse Observations by using Total Stations (SOKKISHA SET 3C -SET2 & power set SDR 030R)
o Traverse and Lot Location Data Processing by using LSAQ programs
o Total Stations and Computer Maintenance
o Lot Location Work by using Total Station
- Establishment the Urban Cadastres Digital Maps scale 1: 500 and the ownership Data Base
o Travers Network establishment
o Lot Location Work by using Total Station
o Establishment the Urban Cadastre Digital Maps scale1 : 500

Technical Qualification & Training

• Excellent Knowledge of Windows Xp, Microsoft Word, Excel, Power Point & Excel.
• Excellent Knowledge of AutoCAD and Photoshop.
• Excellent Knowledge of internet and E-mails.
• Sap 2000 V. 7.42 & 8
• EPANET 2.0 (Water Network Design - Hydraulic Analysis – Models )
• Ms-Project.
• AutoCAD 2002, AutoCAD 2004, AutoCAD 2005, Autodesk Map 2008 & Surfer V.8
• Training in all Surveying Works (With Bridges & Roads for General Authority Cairo – Egypt)
• Training in the Arab Contractors Cairo, Egypt.
• ARC GIS Version 10.2.2

View Abdelbaky’s full profile. It's free!

1 million+ other people are on Universalhunt. Search and connect with the potential people across countries. Invite them to your network, send messages and share opportunities.


View Abdelbaky’s full profile

Contact Details

Send connection reqest to view contact details of Abdelbaky Ahmed.

People You May Know

Thomas Ferguson

Attorney at Law Offices of Thomas M. Ferguson, Esq.

Arvind Purohit

IOS developer at Cre Innovations

Saishiva Guptha

studying at bgti

Muhammad Rehman

(Lead Qa/Qc Engineer) Sharqawi Co.on (SADARA-1) Project Al-Jubail K.S.A at Sharqawi Electromechanical Contracting

Rami Alghuneimi

Project Manager at ALARGAN
View All