Profile
PROFILE
A competent and result driven Mechanical Engineer with around 5+ years of experience across Piping design and detailing, project management, quality assurance, erection, commissioning, fabrication and manpower management; presently spearheading efforts with SHREE SATYANARAYAN INDUSTRIAL SUPPLIERS(SSIS) as Piping & structural Engineer (Digitation:- Piping & Structural Engineer) under RELIANCE (RIL).
Hands on experience and knowledge in Designing, Erection, Maintenance, Fabrication, Quality, Structure Assembly and welding process and procedures & fabrication; adept at Piping Layouts and Designing of Column Piping.
Adept at managing design engineering operations involving design & development, molding of mechanical machines and equipments, co-ordination with internal department, process developments, interfacing with vendors and customers.
Strong background in erection of piping related activities of the project/contract, preparation of BOQ for construction materials as per the approved drawing’s specification and project/contract requirements. Inbuilt ability to use sound judgment, decision-making skills & effectively perform in a self-directed environment.
Well versed with various Safety Procedures & Regulations followed during operations and maintenance of different utilities, facilities and equipments.
Core Competencies
Structural & Piping Engineering ▪ Project Management ▪ Planning/ Designing ▪ Technical Specifications ▪ Site Management ▪ Resource Management ▪ Operations Management ▪ Quality Management ▪ Technical Projections ▪ Cross-functional coordination Fabrication, Commissioning and Erection ▪ Reports/Documentation ▪ Customer/Client Relationship Management PDMS(Piping design & management system)
________________________________________PROFESSIONAL EXPERIENCE
SHREE SATYANARAYAN INDUSTRIAL SUPPLIERS PVT LTD June.2015 to Till date. (Client: RILIANCE) (World largest Refinery) Piping & Structural Engineers.
Attending shutdown and REVAMP activities in HNNU Area in SEZ .
Preparation of as built drawing.
Planning for work and complete it in allotted time.
Fabrication and Erection small and big bore piping for Above and Underground(AG & UG)
Pump and Compressor erection and alignment activities.
Project handling ALGETEC project (Construction to Commissioning)
Attended Training of PDMS-Concept Consulting & infra Pvt Ltd April.2015 to May2015.
Projects Undertaken:
1.) Projects Undertaken:Project : DM water plant (Essar power Chhattisgarh) Key Responsibilities: Worked as PDMS modeller.
2.) Projects Undertaken:
Project : Cooling tower project oman
Significant experience in Equipment & piping modelling in PDMS, Isometric checking/extraction,, proficient in MTO extraction from P&ID, accomplished in Piping Materials – detailing of Piping Material specifications, preparing of Valve datasheets, Pipe Wall Thk Calculation etc.
Proficiency in using NavisWorks 2010, PDMS.
Good knowledge of ASTM standards, ASME codes, PIP standard, PFI standard, OISD standards.
An effective communicator with demonstrated ease in coordinating with team members & sharing resources during project till final date.
INTERNATIONAL ENERGY TECHNOLOGY SERVISES (IETS) Sept. 2014 – April.2015
(Client: CAIRN ENERGY INDIA PVT LTD)(World largest Enhance Oil Recovery –EOR Project-CPF-Centralized Polymer Facilities)
Piping & Structural Engineer
Fabrication and Erection of fire water hydrant line, underground DO line, dilution skid piping, silo tank piping, maturation tank piping & booster pump suction discharge piping.
Preparation of system and subsystem Mark up for CENTRAL POLYMER FACILITIES (CPF).
Heavy equipment erection of E HOUSE, DIESEL GENERATOR, BOOSTER PUMP & AIR COMPRESSOR.
Preparation of as built drawing.
Conducting hydro, pneumatic & holiday testing.
DESIGN DEPATMENT
Material take off from P&ID’S.
Preparation of Job specification, Calculation of Pipe wall thickness calculation in line with design basis.
Vendor Drawing review
Preparation of Valve datasheet of Gate, Globe, Ball, Plug, Butterfly, Check valves.
Piping Material Specification & Valve Material Specification.
Piping modeling of Water lines having dia up to 16”
Commenting P&ID for piping aspects.
Nozzle orientation of Column, Vessels.
Isometric Checking Modeling
Equipment Checking.
OFF Shore Engineering Services July 2014 – Sept. 2014
(Client: CAIRN ENERGY INDIA PVT LTD)
Piping Engineer (De-Bottlenecking project & EOR)
Currently completed 181 Tie-In in Mangla Processing Terminal Shut Down in 4 Days.
Attending shutdown for well hookup jobs.
Preparation of as built drawing.
Planning for work and complete it in allotted time.
Supervision of the workers.
Protean Energy Pvt Ltd. Dec 2013 – June 2014
(Client: CAIRN ENERGY INDIA PVT LTD)
Mechanical Commissioning Engineer
Spearheading efforts as Mechanical Engineer; responsible for preparation and marking of the Test Pack Mark Up P&ID as per system and sub system while ensuring compliance with regulatory requirements and highest quality standards.
Accountable for preparation of system and subsystem Mark up for Aishwariya Wellpads along with Sub System walk down with the operation team for preparation of the punch list and co-ordinate for the liquidation of the same with construction team.
Defining scope of the project and concluding works contracts with qualified & experienced contractors on reasonable terms; enforcing work performance within terms of contract.
Responsible for generation of Construction and Pre-commissioning ITR’s and Co-ordination for the submission same with various disciplines like Instrumentation, Electrical, Mechanical, Civil and Piping.
Instrumental in preparation of Pre-commissioning procedure for Air Blowing and low pressure leak Test.
Developing plan to ensure effective Low pressure leak test., high pressure leak test, Air Blowing & Flushing and preparation of RFSU file, including control of site progress, resolutions of site problems and control of site meetings.
Providing on-site Management and quality control to ensure projects met time and budget requirements, and built-in accordance with contract documents.
Coordinating significantly installation completion, Mechanical Completion and System acceptance Certificate with sub-contractor, PMC and Operation.
Guiding & mentoring the team of Engineers and Draftsman to prepare design & fabrication drawings/checking material indent.
Catskill Infra Pvt. Ltd March – Dec 2013
(Client: CAIRN ENERGY INDIA PVT LTD)
Piping Engineer in OPIC
Performed technical supervision of project as well as fabrication and Erection of small bore Pipe and large bore Pipe (Well pads, processing terminals).
Dealt with piping and pipeline under Cairn India Pvt. Ltd in AISHWARYA project along with attending shutdown for well hookup jobs.
Conducted hydro testing, prepared as built drawing and was also responsible for planning for work and completed it in allotted time.
Prepared MTO & BOM from Isometric and GA Drawings and handled human resources at project site.
Involved in the erection, fabrication, supporting work of pipes and dealing with different piping joints and fabrication, erection and alignment of structure.
Provided technical assistance, guidance & management of the team; handled QA/QC at the site as well as prepared Test Pack.
Petro IT Ltd Oct’11 – Mar’12(Client: CAIRN ENERGY INDIA PVT LTD
Site Engineer on PCMS Project
Looked after the entire gamut of responsibility pertaining to piping plant maintenance and maintenance of construction site producing 1, 75,000 BOPD.
Responsible for marking of the Test Pack Mark Up P&ID as per system and sub system as well as re-instatement of the Piping test packs after completion of Hydro testing.
Handled sites, coordinated with the Client for ITR’s submission after sub system is completed and verified PCMS Data Base for the construction, Pre-Commissioning & commissioning and Start up Phases of the project.
Handled the responsibility of issuing the ITR (Inspection Testing Reports), CCC, MCC, SAC for the ongoing System- Subsystem Project work etc. in force from time to time.
Followed the project from start to finish and make any necessary changes along the way, ensuring that the procedure is being followed while checking the safety features of the project during the time it is being completed.
________________________________________EDUCATIONAL CREDENTIALS
B. Tech. (Mechanical Engineering), 2011
Sri Siddhartha Institute of Technology, VTU, Karnataka; 56%
Computer Proficiency:
Auto CAD, MS Project, PCMS, PIMS, P& ID, Isometric, Windows, MS Office & Internet Applications , PDMS (Piping design & management system).
Projects Undertaken
Title Construction of Chimes Aviation Academy Building, MP
Synopsis The main aim of the project was to gain sound knowledge of project management, contract management, scheduling, WBS, and PEB was explained with the help of this project. Various methods, designs and specifications of the hangar floor, mezzanine floor, apron area and ATC (Air Traffic Controller) have been explained.
Title Design and Fabrication of Fully Handed Mechanized Weeder
Synopsis The project was mainly developed to remove or cut unwanted plant from paddy fields and grassy areas.
Trainings Undergone
Organization TATA ,W.B.S GHATOTAND, JHARKHAND
Duration 19 days
Synopsis The main aim of the training was to study about the working of “POWER GENARATION” in Thermal Power Plant
• Attended 15 days of placement training program conducted by the College.
Academic Accolades
Attended an Entrepreneurship Awareness camp conducted by the Entrepreneurship Development Cell , VTU
.