Profile
Current Project Working in: -
1 National Highway Authority of India (Ministry of Road Transport and Highway Govt. of India).Independent Engineer servies for Four/ Six Laning of Aunta- Simaria (Ganga Bridge with approach roads) section of NH-31 From km 197.900 to km 206.050 (Design Chainage) (Existing Chainage km 204.741 to km 209.945) (Total Design Lenth 8.15 km) in the state of Bihar on Hybrid Annuity Mode.
2 National Highway Authority of India (Ministry of Road Transport and Highway Govt. of India) Project Implementation Unit EPE- II, Noida.
“Consultancy Services for Authority Engineer for super vision Design and Construction of Delhi – Meerut Express Way (Package - IV) from Dasna to Meerut Km. 27.740 of Nh-24 to Km 51.975 of NH-58 (Design Chainage 28+000 to 57+777) in the State of Uttar Pradesh on EPC basis (Length 31.77)” Shift/ Crossing Raising of Height of 11KV,33KV,66KV,132KV,220KV,400KV,S/C & D/C Overhead Transmission Line & LT Line 440V Govt. Department PGCIL, Railway ( 25 kv) ,NTPC, Power Link Transmission Ltd., UPPTCL, WUPPTCL Transmission Line & Solar Power System Project Work From March 2019 to Till Project Cost: INR 1232.21 CR. , Client: National Highway Authority of India (NHAI).